What Should Be In Place Before We Start:
Water Feeds:
Akdy Shower
Firstly the hot and cold water connections, all steam cabins will work of a 15mm/1/2 inch connection. Somewhere behind the unit you will need a water furnish for both your hot and cold ready to be adjusted to associate onto your steam unit. The relationship on the back of the steam cabins valve will always be a 15mm or a '' male connection. The best way to make the relationship between the unit and the furnish is via 'braided flexible hoses'. Because of the way a steam shower is built away from its final resting position to allow the build of it, the braided hoses allow the flexibility required to move the unit back and forth. relationship via the hoses should be made to the 15mm threaded relationship on the valve and some isolating valves fitted on the piping feeding the water furnish to enable you to shut of the water to the shower if needed in time to come (good practice) and this also enables you to turn the water back on the house whist you carry on with the installation. The best units will come with these flexible hoses supplied.
Waste Pipe:
To fully enable your unit to fit fully against the wall or projection desired, without the need to 'cut' or otherwise modify the unit, the wastepipe to the unit will need to be supplied under the floor. A 1 '' wastepipe with enough 'downwards' fall should be placed somewhere under the steam shower. Again because of the need the move the unit colse to whilst the build is taking place, the relationship to the showers trap must be made by a 'flexible waste connector'. The best units will come supplied with these, if not, they are ready to buy from any good hardware store.
Electrics:
Most common steam shower cabins galvanic feed will be made by a 13 amp accepted 240v relationship (two if it has a whirlpool bath function). This is the particular most important bit and with all galvanic works, especially when water is complicated Must be carried out by a excellent trades person. The Steam units wish a 13 amp isolated fused spur to be fitted to ensure full water proofed connection. The sockets must be on a Rcd to ensure protection and to cut off the unit if required. Your electrician will advise you on this, as I said a excellent tradesman must do the electrical fitting. The power within the unit is converted to operate the lighting and radio is converted to a safe 12 volts.
Building The Unit:
Rules You Must Never Forget!
1. Ptfe, which stands for Poly Tetra Fluoro Ethylene or as a plumber calls it Plumbers Tape For Everything. Should be used on every 15mm/ '' connection.
2. Don't screw up and screws tight until the end. This allow the panels and glass to move and twist into position as you go.
3. Check every component before you start
4. Do you need a Pev? Pressure Equalising Valve? Thisonly protects the life and functionality of any shower valve but also helps ensure constant temperatures.
5. If it's potential to fill the tub or tray with water before you start to check of cracks of leaks, do so.
6. After the factory is complete, leave the unit 24 hours to let the any silicone to fully set before use
Base/Tub:
Ones all is in place and you're ready to go, spanner in hand, the first obstacle you'll face is the tray or tub base to the shower itself. First port of call is to fully associate and ensure the watertight relationship of the trays trap and waster pipe. Ensure all rubber gaskets and fittings are tight and well fitted, it might be an idea to our some water into the trap or fill the tub to ensure there's no drips at this stage as it's easier to access. Second, is to fully level the tray or tub via the adjustable legs. Check, check and check again, having the tub fully level is principal to the rest of the build to not only ensure its stands right and upright, but also to ensures all connections are made whilst the personel components are without any gaps and are 'sitting' as they should be.
Wall And Controll Panel:
This is when you'll need two people. First look over every panel and the back of the operate panel and tighten up and connections to the valve, water jets and anything that you can see, as many are only hand tight for converyance purposes and will not initially be water tight. First thing you will need to do is place the 'back panels' onto the tub and all but tighten up there connections to the base, don't tighten these fully yet, leave them with the fixings to hold them in place but slack enough to allow them have some maneuverability. Then place in the operate panel, the best steam shower units will have whether a rubber or plastic strip running along the lengths of where the panels meet to ensure a waterproof fitting, Otherwise it would be more than wise to run a small bead of silicon down the lengths, it's great to use too much silicon than too itsybitsy as any excess can simply be wiped off.
Door Frame And Glass:
With your shower now looking something like a shower. The next thing to tackle is the framework for the glass doors. The best way of doing this is to build this up cut off from the shower itself and lift it into position on its completion. The relationship screws for the framework is notoriously tricky to put together so first ensure you have enough space colse to you to fully manipulate and move the framework around. Starting at the lowest up, first attach the two sides to the base piece, and then the top framework. Then install any 'fixed glasses' and support/holding pieces into the framework. Once this is done, lift the framework onto the shower tray or tub, again using silicone if principal tighten up the relationship between the framework and panels. Rememeber nothing should yet be screwed up tight to allow all pieces to fully fall into place throughout fitting.
Roof:
The Roof is usual the home to all the main functions and features that come with a steam shower. Determined lifting the roof onto the shower, ensure all holes 'marry up' as they should. (it not as important to silicone between the roof and panels that it sites on, as this should be at a level where volumes of water shouldn't be getting to)
Connections:
Now it's probably the best time to fix any shelves, riser rails and any other components that come with the shower to the unit itself and to fully tighten up all the screws and fixings on the shower that have been left, check before doing this that every panel and piece fully stand and fit as they should. Also it's a good time now to associate the electrics to the furnish and associate all the connections to the fan, speakers or any other connections that need to be in place. It's also potential now to associate the hot and cold water via the braided hoses. All relationship should be right forward and labeled to match each other. The steam generator will most communally have three connections to it 1st the water supply, which is most communally placed in the middle and feeds from the shower valve or directly from the cold water feed. 2nd the steam outlet, which is positioned the top of the three and feeds to the steam outlet on the unit and ultimately the 3rd which is the water drainage, this will in most cases fit to the waste via a pipe that's attached to it on a spigot.
Doors:
Hopefully if I haven't missed anything out the last thing you should be left with is the doors to the unit. Before you fit theses it's a good idea, as with any shower enclosure, to run a small bead of silicone along the lengths of the panels and tray/tub to ensure a waterproof fitting. This is not always principal but does greatly add the water integrity of the unit, Then depending on the quality of the unit spend a consolidate of minutes looking for any gaps of weak points on the frame work where any water may penetrate. ultimately the doors, using the door cams provided simply fit these to the frameworks 'runners' adjusting them to fit and slid right via the adjustable cams.
The Final Check:
First run though all the functions both galvanic and water, checking on top, behind and below for any leaks, drips or any sign of anything out of place, Be Thourogh!! After this is all ok which it will be if you have followed this guide, it's time for the final check, put the valve onto the shower head and spray away! Methodically spray the corners then up and down the connected lengths, move to the next, along the bottoms and in turn spray everywhere, with one someone spraying and other behind the unit to check for perfect water integrity before sliding the shower happily back into its final resting place.
That's it, you're done. Relax.
Hopefully along with this guide and a itsybitsy reasoning from yourself your shower is now perfectly installed and ready to use. A steam shower is a remarkable luxury item that is unmistakably remarkable place to relax and unwind, and when installed correctly is a lifelong, endurable highlight for your bathroom.
For more articles like this one please visit us
How to setup the exquisite Steam Shower
Recommend : Motorcycle Store video games Store